Storyhouse, Chester

(Posted on 25/02/19)

Storyhouse, ChesterUCML were asked to coordinate utilities for a prestigious commercial development in Chester known as Storyhouse. Through using UCML, utilities for the project were delivered 6 months ahead of schedule which helped the client’s timeframe for the project. Despite this, the development was complex due to the nature of the site and the electricity load required. After reviewing the point of connection from the network operator, UCML guided the client through the pros and cons of a HV and LV supply to the scheme. The client decided to use HV connections as this gave more room for flexibility regarding the internal requirements of the commercial building which include a cinema and other entertainment. UCML were then able to go out competitively for prices and obtain the most cost effective solution for the client.